VIDEO CLIP |
TITLE |
CONTENT |
![](images/vitec-1.jpg) |
Vitec - 01 |
Work preparation: storing materials in different storage bins |
![](images/vitec-2.jpg) |
Vitec - 02 |
Work preparation: tools selection for stainless steel. |
![](images/vitec-3.jpg) |
Vitec - 03 |
Work preparation. Prepare the work environment. |
![](images/vitec-4.jpg) |
Vitec - 04 |
Work preparation. Earth cabling. |
![](images/vitec-5.jpg) |
Vitec - 05 |
Health and Safety: Fume extraction and light shielding. |
![](images/vitec-6.jpg) |
Vitec - 06 |
Health and Safety: preparation for work. |
![](images/vitec-7.jpg) |
Vitec - 07 |
Heat Distortion: Material movement during buttering. |
![](images/vitec-8.jpg) |
Vitec - 08 |
Heat Distortion: Material thickness and heat distortion |
![](images/vitec-9.jpg) |
Vitec 9 |
Heat Distortion: Fillet weld with one tack |
![](images/vitec-10.jpg) |
Vitec 10 |
Heat Distortion: Fillet weld with three tacks |
![](images/vitec-11.jpg) |
Vitec 11 |
Heat Distortion: Butt welding with one tack vitec |
![](images/vitec-12.jpg) |
Vitec 12 |
Heat Distortion: Back Step Welding |
![](images/vitec-13.jpg) |
Vitec 13 |
Magnetic and non-magnetic material |
![](images/vitec-14.jpg) |
Vitec 14 |
Influence of different tungsten electrode tip angle on the result. |